What falls under zinc and lead work?
Zinc and lead are the materials that finish off a roof. They are found where the roofing ends and something else begins: a chimney, a wall, a dormer, a valley gutter or a roof edge. It is precisely there that the risk of a leak is greatest, because water collects there or can seep away along a seam. Good zinc and lead work ensures that all those transitions stay watertight for years.
In Amsterdam zinc and lead work is especially important. Many buildings from before 1940 have zinc box gutters behind the cornice, lead around dormers and chimneys, and zinc cladding on roof edges and ornaments. On some canal houses there is even a fully zinc roof. That work requires craftsmanship: zinc must be shaped, seamed and soldered, lead must be beaten into shape and set in the joint.
- Zinc: hanging gutters, box gutters, valley gutters and rainwater pipes
- Zinc: roof edges, roof trim and dormer cladding
- Zinc: standing-seam roofs and coping caps on walls
- Lead: lead flashings and shields around the chimney
- Lead: connections between roof and wall, dormer and rooflight
Zinc work: gutters, valley gutters and standing-seam roofs
Zinc is a durable metal that lasts thirty to fifty years with good maintenance, and a zinc roof often longer still. Over time it forms a protective patina layer that protects it against corrosion. Zinc is easy to work: we shape it to measure, seam the joints together or solder them shut. That makes it ideal for custom work, such as the concealed box gutters and valley gutters you often come across in the old city.
A valley gutter lies where two pitched roof surfaces meet and catches a lot of water. A leaking valley gutter is often hard to find, because the water runs away under the tiles and only becomes visible further along. When replacing it, we fit new zinc with sufficient overlap and expansion provisions. For ordinary hanging and box gutters on the roof edge we also refer to our page about gutter replacement.

Lead work at the chimney, dormer and wall
Lead is heavy, supple and lasts forty to fifty years. It can be beaten precisely around the shape of tiles, bricks and window frames, and so keeps a good connection. Around the chimney, lead flashings and shields ensure that water is carried along the brickwork over the tiles. On a dormer and a rooflight, lead does the same at the transition to the roof surface.
When renewing lead there are two common methods. With the inner-leaf method we replace the old lead completely, right up to the inner leaf of the wall or chimney. With the chase method we cut out the joint and set the new lead deeper into the wall, after which the joint is finished again. Which method suits best depends on the construction. If something is also wrong with the brickwork, see our page about chimney renovation.
Signs that zinc or lead needs replacing
Lead and zinc last long, but they also age. Lead can crack after years through expansion and contraction, or come loose because the joint it sits in has weathered. Sometimes the lead was fitted too short or too thin at construction. A white deposit on lead points to corrosion. If you see a damp patch inside next to the chimney or under the dormer, the lead is often the first suspect.
With zinc, leaking seams and soldered spots are the most common problem. After decades the zinc becomes thinner and small holes appear, often in places where leaves and dirt have lain for a long time. Other signs are a gutter that sags or overflows, damp patches on the facade and wood rot on the gutter base. A repair on old, thin zinc is usually temporary; replacement is then the lasting solution.

Craftsmanship: soldering, seaming and room to work
Zinc expands in heat and contracts in cold. A long zinc gutter or a standing-seam roof therefore moves a little every day. If that is not taken into account, the zinc cracks at the seams after a few years. That is why we fit expansion pieces, so the material can move freely without breaking. The soldered seams themselves also need attention: the solder must flow through properly to make a durable, watertight connection.
Another point that is often forgotten is ventilation. Under a zinc roof or large zinc cladding, condensation can form if the air cannot circulate. That moisture attacks the zinc from below, while the top still looks perfectly fine. That is why we make sure of a ventilated build-up. Details like that make the difference between zinc work that lasts ten years and zinc work that stays good for half a century.
Lead or a lead replacement?
Besides lead there are so-called lead replacements, such as plastic flashings, EPDM strips or aluminium. They are lighter and cheaper, and perfectly suitable for some applications on modern homes. Even so, on most Amsterdam roofs we choose real lead. It lasts longer, can be beaten more accurately around old, irregular shapes and stays in place better in strong wind. Lead replacements are also more sensitive to UV light and temperature changes.
On old and listed buildings, appearance also plays a part. A plastic flashing on a nineteenth-century chimney looks out of place and does not suit the character of the building. In a protected cityscape or on a listed building, keeping the original material is often simply the intention. We advise you honestly which solution suits your building, and why.

Zinc and lead work: what does your roof need?
We visit at no cost, assess your roof and give honest advice with a transparent quote.
Zinc and lead in protected cityscapes
In the canal belt, the Jordaan, Plan Zuid and other parts of Amsterdam with a protected cityscape, the streetscape is protected. Zinc and lead have traditionally belonged there: as gutter, as roof edge, as cladding for dormers and as finishing for ornaments. Maintenance with the same material and the same detailing generally does not need a permit on listed buildings. If you want to change something significantly, a permit may be required.
When repairing existing zinc and lead work, we follow profiles and details as closely as possible as they were, so the connections are watertight again and the appearance does not change. If more needs to be done on the roof, you can read more under roof repair. If you are unsure whether something requires a permit, we discuss that beforehand and tell you what to check with the municipality.
Maintenance and combining with other roofing work
With simple maintenance, zinc and lead work lasts much longer. Have gutters and valley gutters cleaned at least once a year, preferably in autumn after the leaves have fallen. Leaves and dirt hold moisture and attack the zinc. A leaf guard or gutter grille helps, especially in streets with many trees. Have the lead around the chimney and dormer checked once a year, so a loose flashing or small crack is repaired in time.
If scaffolding is needed for your zinc or lead work, it is smart to combine other work. Think of replacing gutters, repairing the chimney or checking the tiles. The scaffolding is already there, and you only pay for access once. In Amsterdam that also saves a second notification or object permit for the public space.

Cost of zinc and lead work
The price of zinc and lead work depends on the component and the scope. A few lead flashings around a chimney is a different job from a complete zinc box gutter or a standing-seam roof. The length and type of the zinc work, the chosen method for lead, the condition of the substrate and accessibility also play a part. On tall canal buildings scaffolding is often added, with the associated notification or permit.
In terms of price, S.T. Dakwerken is in the same range as comparable roofers in the Amsterdam region. The free roof inspection determines the final price. You receive a transparent quote upfront stating exactly which zinc or lead work we are replacing, with which method and which materials. If your gutter or chimney is leaking acutely, we are reachable 24/7 for an emergency solution. That way there are no surprises afterwards.
Why S.T. Dakwerken for zinc and lead work?
Zinc and lead work is a craft. It requires experience with soldering, seaming and beating lead, and knowledge of the constructions that are common in Amsterdam. S.T. Dakwerken works with these materials every day and combines that with tiles, bitumen and EPDM, so all the transitions on your roof connect well with each other. Our tradespeople are VCA-certified. Whether it is a single lead flashing or a complete zinc box gutter, you get the same skilled work.
Customers rate us on Trustoo with a 9.8 from 156 reviews. You get up to 10 years' guarantee on our work, depending on the type of work. Want to know the condition of your lead and zinc? Book a free roof inspection. We can usually come by within a day and show you with photos what is fine and what needs attention.







