A new roof for your home in Amsterdam
A roof replacement is the most thorough intervention you can have done on your roof. The complete roof build-up comes off: tiles or roofing, tile battens, membrane and, if necessary, the roof boarding or the insulation. We then rebuild the roof with materials that will last for decades again. The result is a roof that is not only watertight, but also meets current requirements for insulation and safety. S.T. Dakwerken replaces flat and pitched roofs throughout Amsterdam and the surrounding area.
In Amsterdam we come across very different situations in roof replacement. A nineteenth-century building in De Pijp with an old, uninsulated tiled roof. A gallery-access flat in West whose flat roof has already been overlaid three times. A post-war family home in Nieuw-West with weathered concrete tiles. Or a canal house where the roof is due for replacement together with the lead and zinc work. Every situation calls for its own approach, and we agree it with you in advance.
When do you choose a new roof?
A new roof is a considerable investment, so you want to be sure it is necessary. Sometimes a repair or renovation is enough. In other cases, replacement is the wisest and also the most cost-effective choice in the long term. The situations below are, for us, a reason to discuss replacement seriously. During the inspection we look not only at the outside but also at the substructure, because that is often where the decision lies.
- The roofing is at the end of its life
- There are structural leaks in several places
- Tile battens, roof boarding or beams have been affected by moisture
- The flat roof consists of too many old layers to overlay again
- You want to insulate the roof properly in one go
- You are planning solar panels on an old roof

Replace, renovate or repair
The difference lies in how deep we go. With a repair we restore a limited part of the roof. With a roof renovation we renew the roofing and often the insulation, while the structure stays in place. With a roof replacement everything comes off down to the beams or the roof deck, and the substructure is also restored where necessary. Replacement is the right choice if the base is no longer reliable. After all, new roofing on a rotten base never lasts long.
Materials and lifespan of a new roof
With a pitched roof you usually choose between concrete and ceramic roof tiles. Concrete tiles last about thirty to forty years, ceramic tiles often fifty years or longer and they hold their colour better. Smoked ceramic tiles suit older buildings and the historic streetscape well. You can read more about the different tiles on our page about the tiled roof. Zinc is also widely used in Amsterdam, especially on steep roofs and mansard roofs.
For flat roofs we choose between bitumen and EPDM. Bitumen is a proven system that is installed in several layers and lasts twenty to thirty years on average. EPDM is a rubber roofing that is often laid in a single sheet, has few seams and can last thirty to fifty years. If you use the roof as a terrace or solar panels are to be added later, we take that into account in the choice. We give you honest advice on what suits your building and use.

Everything that gets replaced in a roof replacement
A new roof is more than new tiles or new bitumen. It is precisely the parts you can no longer see later that determine how well the roof performs. That is why our quote states exactly which parts we replace and which we keep. When comparing quotes, pay particular attention to what is not included. With some providers, scaffolding, removal of old material, insulation, gutters and leadwork are charged separately.
- Removal and disposal of the old roofing
- Repair of roof boarding or beams where necessary
- New vapour barrier and insulation
- New membrane, counter battens and tile battens on a pitched roof
- New tiles, bitumen or EPDM
- New lead and zinc work at the chimney, dormer and gutters
- New ridge and edge finishing
Permit and planning rules in Amsterdam
If you replace your roof with an equivalent roof, with the same shape and a comparable material and colour, an environmental permit is usually not needed in the Netherlands. In Amsterdam this is more often different. A large part of the city inside the Ring is a protected cityscape, and there it is wise to always contact the municipality first for a complete roof replacement. With a listed building, a whole roof may not be replaced without permission.
We point out beforehand the points that the planning authority and heritage protection look at, such as the type of tile, the colour, the profile and the detailing of gutters and lead. That way you can supply the right information when you apply for a permit, and you avoid delay or a refusal afterwards. You submit the application itself to the municipality. We take the processing time into account in the planning, so the scaffolding only arrives once everything is arranged.

Asbestos in older roofs
Roofs built before 1994 may contain asbestos. Think of corrugated sheets, old artificial slates, asbestos-containing roof boarding or certain old bitumen layers. Asbestos is harmless as long as it is not worked on, but fibres can be released during demolition. A certified remediation company must then remove it first. If we suspect asbestos during the inspection, we let you know and work with a certified partner. We include the remediation in the planning, so the new roof can be laid directly afterwards.
Roof replacement: what does your roof need?
We visit at no cost, assess your roof and give honest advice with a transparent quote.
Scaffolding, accessibility and parking in the city
A complete roof replacement almost always needs scaffolding, for the safety of our roofers and of passers-by. In Amsterdam's inner city, De Pijp and the Jordaan, space on the street is limited. Scaffolding on the public highway requires a permit from the municipality, and arrangements also have to be made for the lorry and the removal of old material. For narrow buildings without a front garden, we think along about clever solutions, such as lifting work or scaffolding that takes up as little space as possible.

Method: watertight every day
We replace a roof in sections. We never strip more than we can make watertight again the same day. That way your home stays dry, even if a shower falls unexpectedly. A flat roof on an average home is usually finished in one to three working days. A pitched roof with concrete tiles generally takes three to six working days, and with ceramic tiles or a lot of zinc work this can rise to about two weeks. The weather and accessibility determine the exact duration.
Cost of a new roof
What a new roof costs depends on the surface area, the material, the condition of the substructure, the insulation and extras such as scaffolding, removal and lead and zinc work. In Amsterdam, accessibility, parking and permits also count. S.T. Dakwerken is in the same price range as comparable roofers in the Amsterdam region. The free roof inspection determines the final price. You receive a transparent quote in which all components are listed separately, so you know exactly what you are paying for.

Insulating with a new roof
There is no better moment to insulate your roof than during a roof replacement. Everything is open, so we can fit the insulation on the outside without you losing any space indoors. On a flat roof this creates a warm roof, with the insulation directly beneath the new roofing. For insulation with an Rd value of at least 3.5 you can apply for ISDE subsidy. How that works and which materials are available, you can read on our page about roof insulation.
Guarantee on your new roof
We give up to 10 years' guarantee on a roof replacement, depending on the material and the execution. At handover we walk through the roof together and you receive photos of the build-up, including of the layers that will soon be invisible. That gives you a clear overview for later, for example when selling the home. To reach the lifespan of the new roof, we recommend having the roof checked annually and keeping the gutters clear of leaves.