When roof replacement in Utrecht is the right choice
Roof replacement in Utrecht is needed when the roof is worn not only on the outside but also underneath. Think of roof boarding that is soft and rotten from years of moisture, tile battens that break when you press on them, or a flat roof with so many layers on it that the structure can barely carry the weight. In those cases, a new top layer is pointless, because the problem continues underneath.
For major building plans too, replacement is often sensible. If you want to turn the loft into a bedroom, have the dormer refurbished or insulate the roof properly at the same time, a new roof is the moment to arrange everything in one go. You avoid having to put up scaffolding again in a few years. We look with you at the best order of work.
Signs in Utrecht homes
A roof that is due for replacement shows it in several places. The roof surface is wavy or sags slightly in the middle. There are leaks in ever-new places, even after repairs. In the loft, you see black or soft patches in the timber, or you smell a musty odour that will not go away. On a flat roof, the surface feels springy when you walk on it, which points to moisture in the insulation or the boarding.
In Utrecht, we see these signs mainly in homes where the roof has long been put off, such as some pre-war buildings in the old neighbourhoods and homes from the 1950s and 1960s in Zuilen, Hoograven and Kanaleneiland. In those homes, the roof is sometimes still the original, or has only been patched up over the years. An inspection makes clear what the real condition is.
- Wavy or sagging roof surface
- Leaks in ever-new places
- Soft or rotten roof boarding
- Springy flat roof
- Brittle tile battens or no membrane

How we build a new roof
On a pitched roof, we remove tiles, battens, membrane and old insulation and assess the boarding and the trusses. Where necessary, we repair or replace them. We then lay insulation, a vapour-permeable membrane, new counter battens and tile battens, and finally the tiles. The lead work at the chimney, dormer and eaves is made completely new, as are the ridge tiles. That way all layers are new and last equally long.
On a flat roof, we remove the old build-up down to the structure. A vapour barrier, insulation boards and new bitumen or EPDM roofing then follow. We make new roof edges, drainage and joints at penetrations and roof domes. If you later want a roof terrace or solar panels, we take that into account in the build-up. You can read more about flat roofs under flat roof bitumen.
Materials and lifespan
On a pitched roof, the choice is usually between fired ceramic tiles and concrete tiles. Ceramic tiles often last fifty years or longer and keep their colour well. Concrete tiles generally last thirty to forty years. On townhouses in Oudwijk or around the Wilhelminapark, you often choose a ceramic tile that suits the look of the property. In protected townscape, you choose a roofing that fits in with the surroundings.
For a flat roof, bitumen lasts around thirty years and EPDM often longer. A green roof with sedum protects the roofing against sun and temperature fluctuations and holds rainwater, which is an advantage during Utrecht's heavy downpours. If you later want a specialist to lay a green roof, the structure must be able to carry the extra weight; we check that beforehand during the inspection. We discuss the options and their pros and cons before you choose.

Rules for a new roof in Utrecht
For replacing a roof with an equivalent roof, a permit is usually not needed. This is different in the city centre, which is largely protected townscape, in the protected part of Oudwijk and on listed buildings. There, an environmental permit may be needed for a new roof or a different roofing. In that case, contact the municipality of Utrecht well in advance, because a permit takes time.
You make the application as the owner. We provide the details you need, such as the material, the colour and the build-up. Scaffolding or a skip on the public highway also often requires permission, especially in the narrow streets of the city centre. We factor that lead time into the planning, so the work can start as soon as everything is in place. That way you avoid standstill.
Roof replacement in Utrecht?
Book a free roof inspection: we visit free of charge and give honest advice.
Asbestos in roofs from before 1994
Roofs laid before 1994 may contain asbestos. Think of corrugated sheets on sheds, old plastic slates, roof boarding or old bitumen layers. In Utrecht, we come across this most often in homes and outbuildings from the 1960s and 1970s. As long as the material stays intact, there is no immediate danger, but fibres can be released when a roof is demolished.
S.T. Dakwerken does not remove asbestos itself. If we see material that may contain asbestos, we advise you to have it investigated and, if necessary, removed by a certified partner. Only after that do we start on the new roof. This affects the planning and the costs, which is why we discuss it at the inspection. That way you know in advance where you stand.

Planning, insulation and subsidy
Replacing a flat roof usually takes a few working days, a tiled roof longer, depending on the surface area and whether structural repairs are needed. We work in sections and make the roof watertight every working day. We keep you informed during the work, and if anything unexpected comes up, we consult you first. Afterwards, you receive photos of the build-up of your new roof.
A new roof calls for good insulation. With an Rd value of at least 3.5, you qualify in 2026 for the ISDE subsidy, which you apply for yourself after the work has been completed. We take care of the details on the invoice. The lead and zinc work around the chimney and dormer can also be renewed straight away. You can read more about insulating on our roof insulation page. That way you get everything out of the same scaffolding. That gives peace of mind.
Costs and quote
The costs of a new roof depend on the surface area, the material, the condition of the structure, the insulation and the accessibility. The scaffolding, the removal of the old roof and new lead and zinc work also count. In terms of price, S.T. Dakwerken is in the same range as comparable roofers in the region. The quote states exactly what is included and what is not, so you can compare quotes fairly.
The free roof inspection determines the final price. You receive the quote beforehand and we only start once you agree. We work VCA-certified, give up to 10 years' guarantee, depending on the work, and customers give us a 9.8 out of 156 reviews on Trustoo. Read more about our work in the city at roofer Utrecht or about the service itself under roof replacement.