Why roof insulation pays off
Warm air rises. In a home without roof insulation, a large part of the heat therefore escapes through the roof. You notice this in a cold loft in winter, heating that has to work hard and a high energy bill. Roof insulation is therefore one of the measures with the most effect. It makes your home more comfortable, lowers your energy use and increases the value of your house, especially now that the energy label carries ever more weight when selling.
Insulation also works in summer. An uninsulated roof heats up considerably in the sun and passes that heat on to the floor below. Anyone who sleeps in a loft room in an Amsterdam upper-floor flat knows the problem. With good roof insulation the heat stays outside and the top floor becomes usable again, even on hot days. Much of Amsterdam's older housing stock, from nineteenth-century buildings to 1930s houses, has never or hardly been insulated. So there is a lot to gain there.
Insulating a pitched roof: inside or outside
A pitched roof can be insulated on the inside or the outside. With insulation on the inside, we fit the insulation material between or against the rafters and finish it with a vapour barrier and a board finish. This can be done separately from the roofing and is therefore suitable if your tiles will last for years yet. A drawback is that you lose some space in the loft. For listed buildings and properties in protected cityscapes, interior insulation is often the indicated route, because the appearance of the roof then stays the same.
We fit insulation on the outside when the tiles are coming off anyway, for example during a renovation or replacement. Insulation boards or insulated roof elements then go on the roof boarding, with new membrane, tile battens and tiles on top. The big advantage is that the insulation is on one continuous side, with few thermal bridges, and that you lose not a centimetre in the loft. In addition, the roofing is renewed at the same time, which avoids double scaffolding costs.

Insulating a flat roof: the warm roof
We prefer to insulate flat roofs on the outside, following the warm roof principle. A vapour barrier goes on the roof deck first, then insulation boards and on top of that the new bitumen or EPDM. This keeps the structure warm and dry and prevents condensation in the roof. The best moment is when the roofing has to be renewed anyway. Do watch the roof edge and the connections at doors and dormers: the roof build-up becomes thicker, so these usually have to be adapted.
Insulation materials and the Rd value
The Rd value indicates how well an insulation layer holds back heat. The higher the value, the better. For the ISDE subsidy a minimum of Rd 3.5 is needed, and for new-build the requirement is even higher. The thickness required depends on the material. Each material has its own advantages in terms of space, sound, moisture regulation and sustainability. We advise you which material best suits your roof and the way you use the space beneath it.
- PIR boards: high insulation value at limited thickness
- Glass wool and rock wool: good sound insulation and fire-safe
- Wood fibre: biobased, good against summer heat
- Cellulose: biobased, also fills awkward spaces well

ISDE subsidy for roof insulation in 2026
Homeowners can apply for roof insulation subsidy via the ISDE, the national government's subsidy scheme for sustainable energy and energy saving. In 2026 this is €16.25 per m² of roof insulation. If you take a second energy-saving measure within 24 months, such as floor or wall insulation, insulating glass or a heat pump, the amount doubles to €32.50 per m². If you choose biobased insulation material, an extra bonus applies as well. Adjusted conditions apply to listed buildings.
You apply for the subsidy yourself at RVO, after the insulation has been fitted. You need the invoice for this, among other things, stating the type of insulation material, the surface area and the insulation value. Our invoice clearly states these details. Bear in mind that the insulation must be fitted by a company and that doing it yourself is not reimbursed. For the current conditions, always check the RVO website, as the rules may change from year to year.
- Insulation value of at least Rd 3.5
- Minimum 20 m² and maximum 200 m² of roof insulation
- Fitted by a company, not done yourself
- Apply after the work is done, within 24 months
Insulating together with renovation or a new roof
Insulation on the outside is most cost-effective when the roof is being opened up anyway. The scaffolding is already there, the old roofing comes off and the labour for the insulation adds only a little. That is why we discuss insulation as standard if you are considering a roof renovation or roof replacement. The reverse also applies: if you want to insulate and the roofing is already somewhat older, it is often smart to tackle both in one go. That way scaffolding does not have to come again in a few years.

Roof insulation: what does your roof need?
We visit at no cost, assess your roof and give honest advice with a transparent quote.
Insulating in Amsterdam buildings and listed buildings
Older Amsterdam buildings need extra care when insulating. They were built to breathe: moisture could escape through gaps and seams. If you seal such a roof hermetically without proper vapour control and ventilation, moisture can remain in the structure, resulting in wood rot. For listed buildings and in protected cityscapes, the appearance of the roof often may not change, so interior insulation is preferred. A permit is sometimes needed. Check with the municipality beforehand which rules apply to your property.
Common mistakes in roof insulation
Insulation only works well if it is fitted carefully. The most common mistake is a missing or interrupted vapour barrier on the warm side, which lets damp indoor air into the insulation where it condenses. Gaps between insulation boards, poorly sealed edges at walls and roof windows, and thermal bridges at beams and wall plates also cost a lot of efficiency. Finally, ventilation is sometimes forgotten. Our roofers watch for all these details, because that is exactly where the difference lies between a warm roof and a damp one.

What determines the cost of roof insulation?
The cost of roof insulation depends on the method, the material, the desired insulation value and the surface area. Insulating on the inside requires a different investment from insulating on the outside, where the roofing is also renewed. Accessibility, any scaffolding and the finishing on the inside count too. S.T. Dakwerken is in the same price range as comparable roofers in the Amsterdam region. The free roof inspection determines the final price. The ISDE subsidy then comes as a benefit to you.
Method, timescale and guarantee
We start with an inspection of the roof and the space beneath it. We look at the structure, the current insulation, any moisture problems and the possibilities. You then receive a quote with the proposed method, the material and the Rd value. For an average home, insulating is usually finished in one to three working days, depending on the method and whether the roofing is renewed at the same time. Our work comes with a guarantee of up to 10 years, depending on the material and the execution.







